|
MENU |
|
|
|
University Mission |
|
University Management |
|
University Administration |
|
Admission & Registration
|
|
Faculties |
|
Research Deanship |
|
Students Affairs |
|
Distance Learning |
|
Training Center |
|
Facilities |
|
Services |
|
Avicenna Center |
|
Avicenna Server |
|
Language Center |
|
Graduation Projects |
|
QAAO |
|
Conferences |
|
Publications |
|
Employment |
|
Contact
Us |
|
|
| Assembling the FOLT Transformer |
A new transformer called FOLT - transformer was designed, built and tested in this project FOLT- transformer are flexible operational losses transformers. The main objective of this new type transformer was to reduce energy losses as the load on transformers is changed. Tests on a prototype of 10 KVA, Y-?, 330/110 volts, 50 Hz. shows that savings can be achieved during the twenty-four hours a day. Results of the testing are presented and recommendations for future work are investigated in this project.
Low Voltage Stage
High Voltage Stage
| Main |
Overview |
Staff Members |
|
|